本文介绍了在Alfresco Community 4.0.e中部署新工作流程定义的最直接方法是什么?的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

我很难在Alfresco Community 4.0.e中部署新的工作流程定义。 Alfresco在Community Edition中没有任何用户界面。我也找不到与此相关的任何Alfresco附加组件。我看过很多讨论此问题的页面,例如:

I am having a hard time deploying a new workflow definition in Alfresco Community 4.0.e. Alfresco does not have any user interface for this in the Community Edition. I could not find any Alfresco add-on related to this either. I have had a look at a lot of pages discussing this, such as these:










  • Difficulties in deploying my own workflow in alfresco workflow console
  • Add new workflow into Alfresco share
  • https://wiki.alfresco.com/wiki/Custom_Share_Workflow_UI
  • http://wiki.alfresco.com/wiki/Workflow_Console
  • http://wiki.alfresco.com/wiki/Dynamic_Models#Dynamic_workflow_process_definitions
  • http://www.jorambarrez.be/blog/2011/01/05/adhoc-workflow-with-activiti-kickstart/
  • http://www.jorambarrez.be/blog/2012/11/28/from-design-to-execution-in-a-matter-of-minutes/
  • http://wiki.alfresco.com/wiki/Workflow_on_Share

但是,我不能让它工作。由于BPMS是Alfresco的关键子系统,因此我几乎可以肯定我没有使用正确的说明。

However, I could not get it to work yet. As the BPMS is a key subsystem of Alfresco, I am nearly sure I not using the correct instructions.

在Alfresco 4.0.e中部署新工作流程定义的最直接方法是什么?有没有针对我的假人的清晰分步说明:)我可以遵循?

What is the most straight-forward method to deploy a new workflow definition in Alfresco 4.0.e? Are there any clear step-by-step instructions, for dummies :) which I can follow?

推荐答案

我认为您错过了最重要的Wiki:

I think you missed the most important wiki:http://wiki.alfresco.com/wiki/WorkflowAdministration

在这里您可以为JBPM安装Eclipse插件。
确保启用以下属性:

Here you can install the Eclipse plugin for JBPM.Make sure you enable these properties:

### BPM Engine ###
system.workflow.engine.jbpm.enabled=true
system.workflow.engine.jbpm.definitions.visible=true
system.workflow.deployservlet.enabled=true

如果正确配置插件,则可以自动部署工作流程。 (部署模型时仍然需要重新启动)。

If you configure the plugin correctly, then automatic deployment of the workflow is possible. (Still need to restart when deploying models)

如果要遵循活动路径,则:

If you want to follow the activiti path then:http://wiki.alfresco.com/wiki/Workflow_with_Activiti

几乎相同的路径,例如安装Eclipse插件或使用其他BPMN20设计器。
唯一不同的方面是,您需要手动部署工作流(导出为.bar文件并将其导入Activiti管理控制台)

Almost the same path, like installing an Eclipse plugin or using another BPMN20 designer.The only different aspect is that you need to manually deploy the workflow (export as .bar file and import it in the Activiti admin-console)

这篇关于在Alfresco Community 4.0.e中部署新工作流程定义的最直接方法是什么?的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持!

10-31 08:45